Forms

Concept Development Forms

Page last updated: December 15, 2014

Title Number  Version Date 
OAKS CI Application for Access (Word) F010-01-CI v1013
OAKS CI New Vendor Information (Word) F010-02-CI v0912
OAKS CI Project Information (Word) F010-03-CI v1214
Project Construction Fund Summary (K12) (Excel) F050-02 v0912
Request for Local Administration (Word) F070-01 v0912
Application for Higher Education Certification (Word) F070-02 v0413
Locally Funded Initiative (LFI) MOU Worksheet (K12) (Excel) F070-04 v0912
Locally Funded Initiative Template (K12) (Word) F070-05 v1212
Swing Space MOU (K12) (Word) F105-01 v0912
OBM Construction Project Request (Web Link) N/A N/A

Procurement Forms
(Note: The Procurement Agreements have moved to the Agreements and Standard Requirements block below).

Page last updated: November 3, 2014

Form Title Number Version Date
OSFC MOU - Commissioning Services (PDF) N/A v1112
OSFC Pre-Qualified Firms - Commissioning Services (PDF) N/A v1112
Requests for Qualifications (RFQs)     
A/E RFQ (Word) F110-02 v1213
  Criteria A/E RFQ (Word)  F110-53  v1213 
  CM Adviser RFQ (Word)  F120-07  v1213 
  Planning Services RFQ (Word)  F130-07  v1213 
  Commissioning Agent RFQ (Word)  F130-08  v1213 
  CM at Risk RFQ (Word)  F170-01  v1213 
  Design Build RFQ (Word)  F180-01 v1213 
RFQ Rating Rubric (PDF)  F199-01  v0913 
RFQ Question-Answer Template (Word)  F110-17  v1212 
Equal Employment Opportunity Requirements (Word) F110-06 v0912
EDGE Participation / Intent to Perform (Word) F110-12 v0912
EDGE Participation/ Demonstration of Good Faith Effort (Word) F110-13 v0912
EDGE Compliance Complaint (Word) F110-15 2014-NOV
Professional Services Shortlist-Selection Report (Word) F110-18 v0912
Statement of Qualifications (Word) F110-330 v0814
Technical Proposal Guidelines (A/E) (Word) M110-93 v0214
Budget Adjustment Financial Summary Report Example (K12) (Excel) F120-01 v0912
Request for Verification - Builders Risk Insurance (K12) (Excel) F120-02 v0912
OAKS CI Contract SOV Import Template (Agency/Higher Ed) (Excel) M140-02-CI v1012
Using the Contract SOV Upload Template (Agency/Higher Ed) (PDF) M140-03-CI v1012
Running the Contract SOV Macro (Agency/Higher Ed) (PDF) M140-04-CI v1012
OAKS CI Contract SOV Import Template - A/E (K12) (Excel)  M140-05-CI v0314
OAKS CI Contract SOV Import Template - Commissioning Agent (K12) (Excel)  M140-06-CI v0314
OAKS CI Contract SOV Import Template - New Construction (K12) (Excel)  M140-07-CI v0314
OAKS CI Contract SOV Import Template - Owner Agent (K12) (Excel)  M140-08-CI v0314
OAKS CI Contract SOV Import Template - Renovation Work (K12) (Excel)  M140-09-CI v0314

 

Design Forms

Page last updated: September 22, 2014

Title  Number Version Date
Professional Services Payment Request (Excel) F205-01 v0313
CM Adviser Payment Request (Excel) F205-02 v0313
Bid Budget Spreadsheet (K-12) (Excel) F250-03 v0912
Certification of Contract Requirements (K-12) (Excel) F250-04 v0113
Delinquent Personal Property Tax Affidavit (K-12) (PDF)  F250-05 v0914
Tax Exempt Certificate (Word) F250-11 v0912
Phase Submission Form (K-12) (Excel) F299-01 v0912
Design Service Acceptance (Word) F299-02 v0912
Site Policy Evaluation Checklist (K-12) (Word) F299-03 v0912
Technology Phase Submission (K-12) (Excel) F299-04 v0912
Technology Review and Budget Transmittal (K-12) (Word) F299-05 v0813
Technology Phase Submission Requirements (K-12) (Word) F299-06 v0813
Technology Review Comments-Drawings (K-12) (Word) F299-07 v0813
Technology Review Comments-Specifications (K-12) (Word)  F299-08 v0813
OSDM Technology and Security Checklist (K-12) (Word)  F299-09 v0414

Construction Forms

Page last updated: November 18, 2014

Title  Number Version Date
Subcontractor & Material Supplier Declaration (Word) F310-01 v0912
Material Stored Off Site (Excel) F310-08 v0912
Contractor Payment Request (Excel) F330-01 v0513
Contractor Payment Request - Short Version (Excel) F330-02 v0513
Certified Payroll Report (Prevailing Wage) (Excel) F330-03 v0912
Certified Payroll Report (Non-Prevailing Wage) (Excel) F330-04 v0912
Drug Free Safety Program Certification (K12) (Word) F330-05 v0912
CM at Risk /Design Build Payment Request (Excel)  F330-07 v0913
Request for Interpretation (Word) F340-01 v0912
Change Order (Excel) F340-04 2014-JUL
Change Directive (formerly Field Work Order) (Word) F340-06 v1012
Field Report (Word) F350-01 v0912
Certification of Contract Completion (Word) F390-01 v0912
Certification of Warranty Commencement (Word) F390-02 v0912
Certification of Equipment Demonstration (Word) F390-03 v0912
Payment Release Affidavit (Word) F390-04 v0912
Certificate of Substantial Completion (Word)  F390-05 2014-NOV
Notice of Commencement of Public Improvement (Word) F640-01 2014-NOV

Post-Construction Forms

Page last updated: November 18, 2014

Form Title Number Version Date
Closeout Calculator 7.0 (K-12) (Excel) F499-04 v0113
Energy Annual Savings Report (Word)  F499-06 2014-NOV
Project Agreement Closeout Procedures (K-12) (Word) M499-01 v0113
Example School District Financial Report (K-12) (PDF) M499-03 v0113
Project Agreement Closeout Process and Timeline (K-12) (PDF)  M499-04 v0414

Miscellaneous Forms

Title Number Version Date
Subcontract Form (Must be used with General Contract,
  CM at Risk Contract, and Design-Build Contract) (Word)
C190-01 v0912
Construction CPM Schedule Specification (Word) M310-11 v0912
Allowance/Procedure for CPM Schedule Specification (Word) M310-12 v0912
Required Use of Domestic Steel Policy (Web Link) GS-D-07 v0912
Implementation Plan Template (K12) (Excel) M010-02 v0912
Public Bid Advertisement (eBid) (Word)  M299-03  v0313
Event Notification (Word) F820-05 v0912
Performance Evaluation (Word)  F899-02 v0414
EDGE Requirement Checklist (Word) M970-01 v0912
OBM Electronic Funds Transfer Authorization (Web Link) N/A N/A
IRS W-9 Form (Web Link) N/A N/A
OBM Vendor Information Form (Web Link) N/A N/A

Agreements and Standard Requirements

Professional Services Agreements

Page last updated: November 21, 2014

Note: Coordinate the edition of the Contract Documents with the A/E or Criteria A/E Contract in effect for the Project.

Number 2012 Edition 2014 Edition Architect/Engineer Agreement Documents
      Agreement Forms
C110-01 v1112 2014-JAN   Agency/Higher Education (Word)
C110-03 v1112+ 2014-NOV   K-12 Schools (Word)
      Exhibits to Agreement
M110-01 v1112 2014-AUG   Exhibit A - A/E Terms and Conditions (PDF)
M110-16 v0912 2014-OCT   Exhibit B - A/E Scope of Services - Multiple-Prime (Word)
M110-26 v1112 2014-NOV   Exhibit B - A/E Scope of Services - Multiple Prime/CM Adviser (Word)
M110-13 v0912 2014-OCT   Exhibit B - A/E Scope of Services - General Contracting (Word)
M110-23 v0912 2014-OCT Exhibit B - A/E Scope of Services - CM at Risk (Word)
M110-53 v0912 2014-OCT   Exhibit B - Criteria A/E Scope of Services - Design-Build (Word)
        Exhibit C - A/E Minimum Stage Submission
M110-05 v0113 2014-NOV   Agency / Higher Education (Word)
M110-05.SFC v0113 2014-NOV   K-12 Schools (Word)
M140-00 71 00 v0213 2014-JUN   Exhibit D - Contracting Definitions - Multiple-Prime (PDF)
M160-00 71 00 v0213 2014-APR   Exhibit D - Contracting Definitions - General Contract (PDF)
M170-00 71 00 v0213 2014-APR   Exhibit D - Contracting Definitions - CM at Risk (PDF)
M180-00 71 00 v0213 2014-APR   Exhibit D - Contracting Definitions - Design-Build (PDF)
M110-07  v0113 2014-JUN   Sample Exhibit E - A/E Special Terms and Conditions (Word)
C110-10 v1012 A/E Amendment (Word)
       
Number 2012 Edition 2014 Edition CM Adviser Agreement Documents
      Agreement Forms 
C120-01 v1112 2014-NOV   Agency/Higher Education (Word)
C120-03 v1112+ 2014-NOV   K-12 Schools (Word)
      Exhibits to Agreement
M120-01  v1112 2014-NOV Exhibit A - CM Adviser Terms and Conditions (PDF)
M120-26 v1112 2014-NOV Exhibit B - CM Adviser Scope of Services - Multiple Prime (Word)
C120-10 v1212 CM Adviser Amendment (Word)
test page      
Number  2012 Edition 2014 Edition Consultant Agreement Documents
      Agreement Forms 
C130-01 v0613 2014-AUG Agency/Higher Education (Word)
C130-03.SFC v0113+ 2014-NOV K-12 Schools (Word)
      Exhibits to Consultant Agreement 
M130-01 v0113 2014-AUG Exhibit A - Consultant Terms and Conditions (PDF)
M130-13 v0912 2014-AUG Exhibit B - Consultant Scope Template (Word)
M131-53 v1112 Exhibit B - Criteria A/E Scope of Services - Design Build (Word)
M132-13  v0113 Exhibit B - Consultant Scope Owner Agent - General Contracting (Word)
M132-23 v0113 Exhibit B - Consultant Scope Owner Agent - CM at Risk (Word)
M132-53 v0113 Exhibit B - Consultant Scope Owner Agent - Design Build (Word)
C130-10 v0912 Consultant Amendment (Word)  


Version Control Documents (Professional Services Agreements)
The following documents are for reference only.

Number  Version Date Title
C110-01  2014-JAN Version Control Document - A/E Agreement Form
(Nov. 2012 - Jan. 2014) (PDF) 
C120-01  2014-NOV Version Control Document - CM Adviser Agreement Form
(Nov. 2012 - Nov. 2014) (PDF)
C120-03.SFC  2014-NOV Version Control Document - CM Adviser Agreement Form (K-12)
(Nov. 2012 - Nov. 2014) (PDF)
M110-01  2014-AUG Version Control Document - Exhibit A - A/E Terms and Conditions
(Jan. 2014 - Aug. 2014) (PDF)
M110-01  2014-JAN Version Control Document - Exhibit A - A/E Terms and Conditions
(Nov. 2012 - Jan. 2014) (PDF)
M110-13  2014-OCT Version Control Document - Exhibit B - A/E Scope of Services - General Contracting
(Feb. 2014 - Oct. 2014) (PDF)
M110-13  2014-FEB Version Control Document - Exhibit B - A/E Scope of Services - General Contracting
(Sept. 2012 - Feb. 2014) (PDF)
M110-23  2014-OCT Version Control Document - Exhibit B - A/E Scope of Services - CM at Risk
(Jan. 2014 - Oct. 2014) (PDF)
M110-23  2014-JAN Version Control Document - Exhibit B - A/E Scope of Services - CM at Risk
(Sept. 2012 - Jan. 2014) (PDF) 
M110-26  2014-NOV Version Control Document - A/E Scope of Services - CM Adviser
(Nov. 2012 - Nov. 2014) (PDF)
M110-53  2014-OCT Version Control Document - Exhibit B - Criteria A/E Scope of Services - Design-Build
(Mar. 2014 - Oct. 2014) (PDF)
M110-53  2014-MAR Version Control Document - Exhibit B - Criteria A/E Scope of Services - Design-Build
(Sept. 2012 - Mar. 2014) (PDF)
M120-01  2014-NOV Version Control Document - CM Adviser Terms & Conditions
(Nov. 2012 - Nov. 2014) (PDF)
M120-26  2014-NOV Version Control Document - CM Adviser Scope of Services - MP
(Nov. 2012 - Nov. 2014) (PDF)

State of Ohio Standard Requirements for Public Facility Construction (Multiple-Prime Contract)

Page last updated: December 17, 2014

Note: Coordinate the edition of the Contract Documents with the A/E Contract in effect for the Project.

Number 2012 Edition 2014 Edition Title
M140-00 01 01  v0912 Instructions to the Architect/Engineer (PDF)
M140-00 01 10 v0912 2014-AUG Table of Contents (Word)
M140-00 10 00  v0113 2014-AUG  Solicitation (Word) 
M140-00 10 00.EB    2014-AUG Solicitation (eBid) (Word)
M140-00 21 13  v0113 2014-AUG  Instructions to Bidders (PDF) 
M140-00 21 13.EB  v0814 2014-AUG Instructions to Bidders (eBid) (PDF) 
M140-00 22 00  v0912 2014-DEC  Supplementary Instructions (Sample) (Word) 
M140-00 41 16  v0614 2014-AUG Bid Form (Word) 
M140-00 41 16.EB    2014-AUG Bid Form (eBid) (Word)
M140-00 43 13  v0614 2014-JUN Bid Security Form (Fillable PDF) 
M140-00 45 13  v0912 2014-JUN  Bidder's Qualifications (PDF) 
M140-00 45 39  v0912 2014-JUN  EDGE Affidavit (PDF)
      Agreement Form 
M140-00 52.00 v0713 2014-NOV State Agency / Higher Education (Word)
M140-00 52.00.SFC v0713+ 2014-NOV   K-12 Schools (Word) 
M140-00 52.00.2YR v0713   Local Administration 2-Year College (Word) 
M140-00 52 00.4YR v0713   Local Administration University (Word)
M140-00 61 13 v0614 2014-APR Performance and Payment Bond Form (Fillable PDF)
M140-00 71 00 v0213 2014-JUN Contracting Definitions (PDF)
M140-00 72 16  v0113+ 2014-OCT General Conditions - Multiple-Prime Contract (PDF)
M140-00 72 26  v0113+  2014-OCT General Conditions - Multiple Prime / CM Adviser (PDF) 
M140-00 73 00  v0912 2014-DEC  Supplementary Conditions (Sample) (Word)
M140-00 73 43 v0912 2014-JUN Wage Rate Requirements (PDF)

Supplementary Documents (Multiple-Prime Contract)

Number Version Date   Ohio School Facilities Commission (Sample)
M140-00 22 00.26.SFC  v0513   Supplementary Instructions - Multiple-Prime / CM Adviser (Word)
M140-00 73 00.26.SFC v0513   Supplementary Conditions - Multiple-Prime / CM Adviser (Word)
       
Number Version Date   Two-Year Colleges (Sample)
M140-00 22 00.2YR  v0113   Supplementary Instructions (Two-Year College) (Word) 
M140-00 73 00.2YR  v0113   Supplementary Conditions - (Two-Year College) (Word)
       
Number  Version Date   Bowling Green State University
M140-00 73 00.16.BGU  v0413   Supplementary Conditions - Multiple-Prime (PDF)
M140-00 73 00.26.BGU  v0413   Supplementary Conditions - Multiple-Prime / CM Adviser (PDF)
       
Number   Version Date   The Ohio State University
M140-00 73 00.16.OSU  v1113   Supplementary Conditions - Multiple-Prime (PDF)
       
Number   Version Date   Sinclair Community College
M140-00 73 00.SCC   2014-FEB Supplementary Instructions - Multiple-Prime (PDF)
M140-00 73 00.16.SCC   2014-FEB Supplementary Conditions - Multiple-Prime (PDF)
       
Number  Version Date   The University of Akron
M140-00 73 00.16.UAK  v1212   Supplementary Conditions - Multiple-Prime (PDF)
       
Number  Version Date   Wright State University
M140-00 73 00.16.WSU  v0413   Supplementary Conditions - Multiple-Prime (PDF)

Version Control Documents (Multiple-Prime Contract)
The following documents are for reference only.

Number  Version Date   Title
M140-01 v0612   Version Control Document - Multiple-Prime
(Sept 2011 - June 2012) (PDF)
M140-01 v0912   Version Control Document - Multiple-Prime
(June 2012 - Sept 2012) (PDF)

State of Ohio Standard Requirements for Public Facility Construction (General Contract)

Page last updated: December 17, 2014

Note: Coordinate the edition of the Contract Documents with the A/E Contract in effect for the Project.

Number 2012 Edition 2014 Edition Title
M160-00 01 01  v0912 Instructions to the Architect/Engineer (PDF)
M160-00 01 10 v0912 2014-AUG Table of Contents (Word)
M160-00 10 00  v0113 2014-AUG Solicitation (Word) 
M160-00 10 00.EB  v0713 2014-AUG Solicitation (eBid) (Word)
M160-00 21 13  v0113 2014-AUG Instructions to Bidders (PDF) 
M160-00 21 13.EB  v0713 2014-AUG Instructions to Bidders (eBid) (PDF)
M140-00 22 00  v0912 2014-DEC  Supplementary Instructions (Sample) (Word) 
M160-00 41 16  v0912 2014-AUG Bid Form (Word) 
M160-00 41 16    2014-AUG Bid Form (eBid) (Word)
M140-00 43 13  v0614 2014-JUN Bid Security Form (Fillable PDF) 
M140-00 45 13  v0912 2014-JUN  Bidder's Qualifications (PDF) 
M140-00 45 39  v0912 2014-JUN  EDGE Affidavit (PDF)
      Agreement Form 
M140-00 52.00 v0713 2014-NOV State Agency / Higher Education (Word)
M140-00 52.00.SFC v0713+ 2014-NOV   K-12 Schools (Word) 
M140-00 52.00.2YR v0713   Local Administration 2-Year College (Word) 
M140-00 52 00.4YR v0713   Local Administration University (Word)
M140-00 61 13 v0614 2014-APR Performance and Payment Bond Form (Fillable PDF)
M160-00 71 00 v0213 2014-APR Contracting Definitions (PDF)
M160-00 72 13  v0113+ 2014-OCT General Conditions (PDF)
M140-00 73 00  v0912 2014-DEC  Supplementary Conditions (Sample) (Word)
M140-00 73 43  v0912 2014-JUN Wage Rate Requirements (PDF)
C190-01  v0912   Subcontract Form (Word) (Must be used with General Contract,
CM at Risk Contract and Design-Build Contract) 

Supplementary Documents (General Contract)

Number Version Date Ohio School Facilities Commission (Sample)
M160-00 22 00.13.SFC  v0513 Supplementary Instructions - General Contract (Word)
M160-00 73 00.13.SFC v0513 Supplementary Conditions - General Contract (Word)
     
Number Version Date Two-Year Colleges (Sample)
M140-00 22 00.2YR  v0113 Supplementary Instructions - (Two-Year College) (Word) 
M140-00 73 00.2YR  v0113 Supplementary Conditions - (Two-Year College) (Word)
     
Number  Version Date Bowling Green State University
M160-00 73 00.13.BGU  v0413 Supplementary Conditions - General Contract (PDF)
     
Number   Version Date The Ohio State University
M160-00 73 00.13.OSU  2014-JUN Supplementary Conditions - General Contract (PDF)
     
Number   Version Date Sinclair Community College
M140-00 22 00.SCC  2014-FEB Supplementary Instructions - General Contract (PDF)
M160-00 73 00.13.SCC  2014-FEB Supplementary Conditions - General Contract (PDF)
     
Number  Version Date The University of Akron
M160-00 73 00.13.UAK  v0913 Supplementary Conditions - General Contract (PDF)
     
Number  Version Date Wright State University
M160-00 73 00.13.WSU  v0413 Supplementary Conditions - General Contract (PDF)

Version Control Documents (General Contract)
The following documents are for reference only.

Number  2012 Edition 2014 Edition Title
M160-01    2014 Version Control Document - General Contract (PDF)
M160-01 v0612   Version Control Document - General Contract
(Dec 2011 - June 2012) (PDF)
M160-01 v0912   Version Control Document - General Contract
(June 2012 - Sept 2012) (PDF)

State of Ohio Standard Requirements for Public Facility Construction (CM at Risk Contract)

Page last updated: December 17, 2014

Note: Coordinate the edition of the Contract Documents with the A/E Contract in effect for the Project.

Number 2012 Edition 2014 Edition Title
M170-00 01 01  v0912  2014-AUG Table of Contents (Word)
      Request for Proposal
M170-00 11 19    2014-OCT State Agency / Higher Education (Word)
M170-00 11 19.SFC   2014-OCT   K-12 Schools (Word)
M170-00 21 16  2014-JUL 2014-OCT Instructions to Proposers (PDF)
F170-00 43 23 2014-OCT 2014-OCT Proposal / Best Value Rating Form (Excel)
M140-00 45 30    2014-JUN EDGE Affidavit (PDF)
      Agreement Form 
M170-00 52 23 v0713 2014-AUG State Agency / Higher Education (Word)
M170-00 52.23.SFC v0713+ 2014-NOV   K-12 Schools (Word) 
M170-00 52.23.2YR v0713 2014-AUG   Local Administration 2-Year College (Word) 
M170-00 52 23.4YR v0713 2014-AUG   Local Administration University (Word)
      Exhibits to Agreement
M170-00 52 23.XA v0213 2014-OCT Exhibit A - Personnel Rate Schedule (Word)
M170-00 52.23.XB v0213 2014-OCT Exhibit B - Reimbursable Expenses Schedule (Word)
M170-00 52.23.XC v0213 2014-OCT Exhibit C - General Conditions Costs Description (Word)
        Exhibit D - GMP Amendment
M170-00 53 23* v0713 2014-NOV State Agency / Higher Education (Word) 
M170-00 53.23.SFC* v0713+ 2014-NOV K-12 Schools (Word)
M170-00 53.23.2YR* v0713   Local Administration 2-Year College (Word) 
M170-00 53.23.4YR* v0713   Local Administration University (Word)
M170-00 61 13.13 v0912 2014-APR Performance Bond Form (Fillable PDF)
M170-00 61 13.16 v0912 2014-APR Payment Bond Form (Fillable PDF)
M170-00 71 00 v0213 2014-APR Contracting Definitions (PDF)
M170-00 72 23  v0113+ 2014-OCT General Conditions (PDF)
M140-00 73 00 v0912 2014-DEC Supplementary Conditions (Sample) (Word) 
M170-00 73 43 v0912 2014-APR Wage Rate Requirements (PDF)
C190-01 v0912 Subcontract Form (Word) (Must be used with CM at Risk Contract)

*GMP Amendment form number for the 2012 Edition is M170-00 63 23

Supplementary Documents (CM at Risk Contract)

Number 2012 Edition 2014 Edition Ohio School Facilities Commission (Sample)
M140-00 73 00.23.SFC v0513  2014-JAN Supplementary Conditions - CM at Risk (Word)
     
Number Version Date Two-Year Colleges (Sample)
M140-00 73 00.2YR  v0113 Supplementary Conditions - CM at Risk (Word)
     
Number  Version Date Bowling Green State University
M170-00 73 00.23.BGU  v0413 Supplementary Conditions - CM at Risk (PDF)
     
Number   Version Date The Ohio State University
M170-00 73 00.23.OSU  2014-JUN Supplementary Conditions - CM at Risk (PDF)
     
Number  Version Date Wright State University
M170-00 73 00.23.WSU  v0413 Supplementary Conditions - CM at Risk (PDF)

Version Control Documents (CM at Risk Contract)
The following documents are for reference only.

Number  2012 Edition 2014 Edition Title
M170-01    2014 Version Control Document - CM at Risk (PDF)
M170-01 v0612   Version Control Document - CM at Risk 
(Feb 2012 - June 2012) (PDF)
M170-01 v0912   Version Control Document - CM at Risk 
(June 2012 - Sept 2012) (PDF)

State of Ohio Standard Requirements for Public Facility Construction (Design-Build Contract)

Page last updated: December 17, 2014

Note: Coordinate the edition of the Contract Documents with the Criteria A/E Contract in effect for the Project.

   
Number 2012 Edition 2014 Edition Title
M180-00 01 10  v0912 2014-AUG Table of Contents (Word)
F180-00 43 53 v0313 2014-OCT Proposal / Best Value Rating Form (Excel)
M140-00 45 39  2014-JUN EDGE Affidavit (PDF)
      Agreement Form 
M180-00 52 53 v0713 2014-AUG State Agency / Higher Education (Word)
M180-00 52.53.SFC v0713+ 2014-NOV   K-12 Schools (Word) 
M180-00 52.53.2YR v0713   Local Administration 2-Year College (Word) 
M180-00 52 53.4YR v0713   Local Administration University (Word)
      Exhibits to Agreement
M180-00 54 13 v0912 2014-APR Exhibit A - Supplementary Scope Statement (AOR) (PDF)
M180-00 52.53.XC v0213 Exhibit C - AOR's Fee Schedule for Personnel (Word)
M180-00 52.53.XD v0213 Exhibit D - Personnel Rate Schedule (Word)
M180-00 52.53.XE  v0213      Exhibit E - Reimbursable Expenses Schedule (Word) 
M180-00 52.53.XF  v0213      Exhibit F - General Conditions Costs Description (Word) 
      Exhibit G - GMP Amendment
M180-00 63 23* v0713 2014-NOV State Agency / Higher Education (Word)
M180-00 63.23.SFC* v0713+ 2014-NOV K-12 Schools (Word)
M180-00 63.23.2YR* v0713   Local Administration 2-Year College (Word)
M180-00 63.23.4YR*  v0713   Local Administration University (Word)
M170-00 61 13.13 v0912 2014-APR Performance Bond Form (Fillable PDF)
M170-00 61 13.16 v0912 2014-APR Payment Bond Form (Fillable PDF)
M180-00 71 00 v0213 2014-APR Contracting Definitions (PDF)
M180-00 72 53  v0113+ 2014-OCT General Conditions (PDF)
M140-00 73 00 v0912 2014-DEC Supplementary Conditions (Sample) (Word) 
M180-00 73 43 v0912 2014-APR Wage Rate Requirements (PDF)
C190-01 v0912 Subcontract Form (Word) (Must be used with CM at Risk Contract)

*GMP Amendment form number for the 2012 Edition is M180-00 63 23

Supplementary Documents (Design-Build Contract)

Number Version Date Ohio School Facilities Commission (Sample)
M140-00 73 00.53.SFC v0513 Supplementary Conditions - Design-Build Contract (Word)
     
Number Version Date Two-Year Colleges (Sample)
M140-00 73 00.2YR  v0113 Supplementary Conditions - Design-Build Contract (Word)
     
Number  Version Date Bowling Green State University
M180-00 73 00.53.BGU  v0413 Supplementary Conditions - Design-Build Contract (PDF)
     
Number   Version Date The Ohio State University
M180-00 73 00.53.OSU  2014-JUN Supplementary Conditions - Design-Build Contract (PDF)
     
Number  Version Date Wright State University
M180-00 73 00.53.WSU  v0413 Supplementary Conditions - Design-Build Contract (PDF)

Version Control Documents (CM at Risk Contract)
The following documents are for reference only.

Number  2012 Edition 2014 Edition Version Control Documents
     2014 Version Control Document - Design Build (PDF) 
M180-01 v0612   Version Control Document - Design Build
(April 2012 - June 2012) (PDF)
M180-01 v0912   Version Control Document - Design Build
(June 2012 - Sept 2012) (PDF)

Number  2012 Edition 2014 Edition Title
C190-01  v0912   Subcontract Form (Must be used with General Contract,
CM at Risk Contract and Design Build Contract) (Word)
M310-11 v0912   Construction CPM Schedule Specification (Word)
M310-12 v0912   Allowance Procedure for CPM Schedule Specification (Word)
GS-D-07 v0909   Required Use of Domestic Steel Policy (Web Link)

Notice

The State of Ohio Standard Requirements for Public Facility Construction ("Standard Requirements") and the State of Ohio Standard Forms and Documents are the property of the State of Ohio Ohio Facilities Construction Commission (OFCC) and are for public use only.

These files are not to be altered in any way, except where recognized blanks are filled-in with specific names, amounts, and other data for the purpose of personalizing the file for a specific agency, company and/or person. Any other changes made to these files must be approved, in writing, by the OFCC. The OFCC and the State of Ohio will not be held liable for changes made without our written approval.