Agreements and Standard Requirements

Page last updated: April 05, 2018

Architect/Engineer Agreements

Title Date Number
 
Agreement Forms
State Agency / Higher Education [DOC] 2017-MAY C110-01
K-12 School Project [DOC] 2017-MAY C110-03
Local College Project [DOC] 2017-MAY C110-02
Local University Project [DOC] 2017-MAY C110-04
 
Exhibits to Agreements
Exhibit A - A/E Terms and Conditions [PDF] 2018-JAN M110-01
Exhibit B - A/E Scope of Services
Multiple-Prime [DOCX] 2017-OCT M110-16
Multiple-Prime / CM Adviser [DOCX] 2016-JAN M110-26
K-12 School CM Adviser [DOCX] 2017-AUG M110-26.K12 
General Contracting [DOCX] 2017-OCT M110-13
K-12 School General Contracting [DOCX] 2017-OCT M110-13.K12
CM at Risk [DOCX]
(Use with Projects announced AFTER Jan. 1, 2018)
2018-JAN M110-23
CM at Risk [DOCX]
(Use with Projects announced BEFORE Jan. 1, 2018)
2017-OCT M110-23
K-12 School CM at Risk [DOCX]
(Use with Projects announced AFTER Jan. 1, 2018)
2018-JAN M110-23.K12
K-12 School CM at Risk [DOCX]
(Use with Projects announced BEFORE Jan. 1, 2018)
2017-OCT M110-23.K12
Criteria A/E - Design-Build [DOCX] 2016-JAN M110-53
Exhibit C - A/E Minimum Stage Submission Requirements
State Agency/Higher Education [DOCX] 2014-NOV M110-05
K-12 School Project [DOCX] 2017-SEP M110-05.K12
Exhibit D - Contracting Definitions
Multiple-Prime [PDF] 2016-MAR M140-00 71 00
General Contracting [PDF] 2016-MAR M160-00 71 00
CM at Risk [PDF]
(Use with Projects announced AFTER Jan. 1, 2018)
2018-JAN M170-00 71 00
CM at Risk [PDF]
(Use with Projects announced BEFORE Jan. 1, 2018)
2016-MAR M170-00 71 00
Criteria A/E - Design-Build [PDF] 2016-MAR M180-00 71 00
Exhibit E - A/E Special Terms and Conditions
Sample [DOCX] 2014-JUN M110-07
 
Amendment Forms
State Agency / Higher Education [DOCX] 2016-JAN C110-10
K-12 School Project [DOCX] 2016-JAN C110-13

 

CM Adviser Agreements

Title Date Number
 
Agreement Forms
State Agency / Higher Education [DOCX] 2017-MAY C120-01
K-12 School Project [DOCX] 2017-MAY C120-03
Local College Project [DOCX] 2017-MAY C120-02
Local University Project [DOCX] 2017-MAY C120-04
 
Exhibits to Agreements
Exhibit A - CM Adviser Terms and Conditions [PDF] 2016-JAN M120-01
Exhibit B - CM Adviser Scope of Services - Multiple Prime [DOCX] 2016-JAN M120-26
 
Amendment Form
State Agency / Higher Education [DOCX] 2016-JAN C120-10
K-12 School Project [DOCX] 2016-JAN C120-13

 

Consultant Agreements

Title Date Number
 
Agreement Form
State Agency / Higher Education [DOCX] 2017-MAY C130-01
K-12 School Project [DOCX] 2018-APR C130-03
College Project [DOCX] 2017-MAY C130-02
 
Exhibits to Agreements
Exhibit A - Consultant Terms and Conditions [PDF] 2016-AUG M130-01
Exhibit B Consultant Scope of Services
Template [DOCX] 2014-AUG M130-13
A/E- General Contracting 2018-APR M132-13
Consultant Scope Peer Review  2018-APR M130-09
Commissioning [DOCX] 2015-AUG M130-05
Retro-Commissioning [DOCX] 2015-AUG M130-07
K-12 School Commissioning [DOCX] 2017-SEP M130-08
Criteria A/E - Design Build [DOCX] 2015-AUG M131-53
Owner Agent - CM at Risk [DOCX] 2015-OCT M132-23
Owner Agent - Design Build [DOCX] 2015-OCT M132-53
 
Amendment Form
State Agency / Higher Education [DOCX] 2016-JUL C130-10
K-12 School Project [DOCX] 2016-JAN C130-13

 

Version Control

The following documents are for reference only.

Title Date Number
 
Architect/Engineer Version Control Agreements
Agreement Form
Version Control Document - A/E Agreement Form
(Jan 2016 - 2017-MAY) [PDF]
2017-MAY C110-01
Version Control Document - A/E Agreement Form - K-12 School
(Jan 2016 - 2017-MAY) [PDF]
2017-MAY C110-03
Version Control Document - A/E Agreement Form
(June 2015 - Jan 2016) [PDF]
2016-JAN C110-01
Version Control Document - A/E Agreement Form
(Jan 2014 - June 2015) [PDF]
2015-JUN C110-01
Version Control Document - A/E Agreement Form
(Nov 2012 - Jan 2014) [PDF]
2014-JAN C110-01
Exhibit A - Terms and Conditions
Version Control Document - Exhibit A - A/E Terms and Conditions
(Aug 2016 - Jan 2016) [PDF]
2018-JAN C110-01
Version Control Document - Exhibit A - A/E Terms and Conditions
(Jan 2016 - Aug 2016) [PDF]
2016-AUG C110-01
Version Control Document - Exhibit A - A/E Terms and Conditions
(Aug 2014 - Jan 2016) [PDF]
2016-JAN M110-01
Version Control Document - Exhibit A - A/E Terms and Conditions
(Jan 2014 - Aug 2014) [PDF]
2014-AUG M110-01
Version Control Document - Exhibit A - A/E Terms and Conditions
(Nov 2012 - Jan 2014) [PDF]
2014-JAN M110-01
Exhibit B - Scope of Services
Version Control Document - Exhibit B - A/E Scope of Services - General Contracting
(Oct 2014 - Jan 2016) [PDF]
2016-JAN M110-13
Version Control Document - Exhibit B - A/E Scope of Services - General Contracting
(Feb 2014 - Oct 2014) [PDF]
2014-OCT M110-13
Version Control Document - Exhibit B - A/E Scope of Services - General Contracting
(Sept 2012 - Feb 2014) [PDF]
2014-FEB M110-13
Version Control Document - Exhibit B - A/E Scope of Services - Multiple-Prime
(Oct 2014 - Jan 2016) [PDF]
2016-JAN M110-16
Version Control Document - Exhibit B - A/E Scope of Services - Multiple-Prime
(Sept 2012 - Oct 2014) [PDF]
2014-OCT M110-16
Version Control Document - Exhibit B - A/E Scope of Services - CM at Risk
(Jan 2016 - Jan 2018) [PDF]
2018-JAN M110-23
Version Control Document - Exhibit B - A/E Scope of Services - K-12 School CM at Risk
(Jan 2016 - Jan 2018) [PDF]
2018-JAN M110-23.K12
Version Control Document - Exhibit B - A/E Scope of Services - CM at Risk
(Oct 2014 - Jan 2016) [PDF]
2016-JAN M110-23
Version Control Document - Exhibit B - A/E Scope of Services - CM at Risk
(Jan 2014 - Oct 2014) [PDF]
2014-OCT M110-23
Version Control Document - Exhibit B - A/E Scope of Services - CM at Risk
(Sept 2012 - Jan 2014) [PDF]
2014-JAN M110-23
Version Control Document - Exhibit B - A/E Scope of Services - CM Adviser
(Nov 2014 - Jan 2016) [PDF]
2016-JAN M110-26
Version Control Document - Exhibit B - A/E Scope of Services - CM Adviser
(Nov 2012 - Nov 2014) [PDF]
2014-NOV M110-26
Version Control Document - Exhibit B - Criteria A/E Scope of Services - Design-Build
(Oct 2014 - Jan 2016) [PDF]
2016-JAN M110-53
Version Control Document - Exhibit B - Criteria A/E Scope of Services - Design-Build
(Mar 2014 - Oct 2014) [PDF]
2014-OCT M110-53
Version Control Document - Exhibit B - Criteria A/E Scope of Services - Design-Build
(Sept 2012 - Mar 2014) [PDF]
2014-MAR M110-53
 
CM Adviser Version Control Agreements
Agreement Form
Version Control Document - CM Adviser Agreement Form
(Nov. 2014 - Jan. 2016) [PDF]
2016-JAN C120-01
Version Control Document - CM Adviser Agreement Form
(Nov. 2012 - Nov. 2014) [PDF]
2014-NOV C120-01
Version Control Document - CM Adviser Agreement Form (K-12) 2014-NOV C120-03
Exhibit A - Terms and Conditions
Version Control Document - Exhibit A - CM Adviser Terms & Conditions 2016-JAN M120-01
Version Control Document - Exhibit A - CM Adviser Terms & Conditions 2014-NOV M120-01
Exhibit B - Scope of Services
Version Control Document - Exhibit B - CM Adviser Scope of Services 2014-JAN M120-26
Version Control Document - Exhibit B - CM Adviser Scope of Services 2014-NOV M120-26

Standard Requirements for Public Facility Construction (Multiple-Prime Project)

Page last updated: November 30, 2017

Contract Documents - Multiple Prime Projects
Title Date Number
Instructions to the Architect/Engineer [PDF] 2016-JAN M140-00 01 01
Table of Contents [DOCX] 2014-AUG M140-00 01 10
Paper Bidding Documents
Solicitation [DOCX] 2017-NOV M140-00 10 00
Instructions to Bidders [PDF] 2016-JAN M140-00 21 13
Bid Form [DOCX] 2015-SEP M140-00 41 16
Electronic Bidding Documents
Solicitation (eBid) [DOCX] 2016-AUG M140-00 10 00.EB
Instructions to Bidders (eBid) [PDF] 2016-JAN M140-00 21 13.EB
Bid Form (eBid) [DOCX] 2017-JUN M140-00 41 16.EB
Supplementary Instructions (Sample) [DOCX] 2014-DEC M140-00 22 00
Bid Security Form [PDF] 2014-JUN M140-00 43 13
Bidder's Qualifications [PDF] 2014-JUN M140-00 45 13
EDGE Affidavit [PDF] 2016-MAR M140-00 45 39
Agreement Form
State Agency / Higher Education [DOCX] 2017-MAY M140-00 52.00
K-12 School Project [DOCX] 2017-MAY M140-00 52.00.K12
Local College Project [DOCX] 2017-MAY M140-00 52 00.2YR
Local University Project [DOCX] 2017-MAY M140-00 52 00.4YR
Performance and Payment Bond Form [PDF] 2014-APR M140-00 61 13
Contracting Definitions [PDF] 2016-MAR M140-00 71 00
General Conditions
General Conditions - Multiple-Prime [PDF] 2017-JUN M140-00 72 16
General Conditions - Multiple Prime / CM Adviser [PDF] 2017-JUN M140-00 72 26
Supplementary Conditions (Sample) [DOCX] 2014-DEC M140-00 73 00
Wage Rate Requirements [PDF] 2014-JUN M140-00 73 43
Combined File of Multiple-Prime Contract Documents [PDF] 2016-JAN M140-01

 

Supplementary Documents - Multiple Prime Projects

Owner/Title Date Number
K-12 or Career-Tech School Project (Sample)
Supplementary Instructions - Multiple-Prime / CM Adviser [DOCX] 2017-SEP M140-00 22 00.26.K12
Supplementary Conditions - Multiple-Prime / CM Adviser [DOCX] 2017-SEP M140-00 73 00.26.K12
Two-Year Colleges (Sample)
Supplementary Instructions - Two-Year College [DOCX] 2013-JAN M140-00 22 00.2YR
Supplementary Conditions - Two-Year College [DOCX] 2013-JAN M140-00 73 00.2YR
Bowling Green State University
Supplementary Conditions - Multiple-Prime [PDF] 2013-APR M140-00 73 00.16.BGU
Supplementary Conditions - Multiple-Prime / CM Adviser [PDF] 2013-APR M140-00 73 00.26.BGU
The Ohio State University
Supplementary Conditions - Multiple-Prime [PDF] 2016-AUG M140-00 73 00.16.OSU
Sinclair Community College
Supplementary Instructions [PDF] 2015-NOV M140-00 73 00.SCC
Supplementary Conditions - Multiple-Prime [PDF] 2015-NOV M140-00 73 00.16.SCC
University of Akron
Supplementary Conditions - Multiple-Prime [PDF] 2015-MAY M140-00 73 00.16.UAK
Wright State University
Supplementary Conditions - Multiple-Prime [PDF] 2016-MAR M140-00 73 00.16.WSU

 

Verison Control Documents - Multiple Prime Projects

The following documents are for reference only.

Title Date Number
Version Control Document - Multiple-Prime
(July 2015 - Jan 2016) [PDF]
2016-JAN M140-01-VC
Version Control Document - Multiple-Prime
(Sept 2012 - July 2015) [PDF]
2015-JUL M140-01-VC
Version Control Document - Multiple-Prime
(June 2012 - Sept 2012) [PDF]
2012-SEP M140-01-VC
Version Control Document - Multiple-Prime
(Sept 2011- June 2012) (PDF)
2012-JUN M140-01-VC

Standard Requirements for Public Facility Construction (General Contracting Project)

Page last updated: November 30, 2017

Contract Documents - General Contracting Projects

Title Date Number
Instructions to the Architect/Engineer [PDF] 2016-JAN M160-00 01 01
Table of Contents [DOCX] 2015-JUL M160-00 01 10
Paper Bidding Documents
Solicitation [DOCX] 2017-NOV M160-00 10 00
Instructions to Bidders [PDF] 2016-JAN M160-00 21 13
Bid Form [DOCX] 2015-SEP M160-00 41 13
Electronic Bidding Documents
Solicitation (eBid) [DOCX] 2016-AUG M160-00 10 00.EB
Instructions to Bidders (eBid) (PDF) 2016-JAN M160-00 21 13.EB
Bid Form (Single Bid Package eBid) [DOCX] 2017-OCT M160-00 41 13.EB
Bid Form (Multiple Bid Packages eBid) [DOCX] 2017-JUN M160-00 41 19.EB
Supplementary Instructions (Sample) [DOCX] 2014-DEC M140-00 22 00
Bid Security Form [Fillable PDF] 2014-JUN M140-00 43 13
Bidder's Qualifications [PDF] 2014-JUN M140-00 45 13
EDGE Affidavit [PDF] 2014-JUN M140-00 45 39
Agreement Forms
State Agency / Higher Education [DOCX] 2017-MAY M140-00 52.00
K-12 School Project [DOCX] 2017-MAY M140-00 52.00.K12
Local College Project [DOCX] 2017-MAY M140-00 52 00.2YR
Local University Project [DOCX] 2017-MAY M140-00 52 00.4YR
Subcontract Form (Must be used with General Contracting Projects) [DOCX] 2016-OCT C190-00 52 14
Performance and Payment Bond Form [Fillable PDF] 2014-APR M140-00 61 13
Contracting Definitions [PDF] 2016-MAR M160-00 71 00
General Conditions [PDF] 2017-JUN M160-00 72 13
Supplementary Conditions (Sample) [DOCX] 2014-DEC M140-00 73 00
Wage Rate Requirements [PDF] 2014-JUN M140-00 73 43
Combined File of General Contracting Contract Documents [PDF] 2016-JAN M160-01

 

Supplementary Documents - General Contracting Projects

Owner / Title Date Number
K-12 or Career-Tech School Project (Sample)
Supplementary Instructions - General Contracting [DOCX] 2017-SEP M160-00 22 00.13.K12
Supplementary Conditions - General Contracting [DOCX] 2017-SEP M160-00 73 00.13.K12
Two-Year Colleges (Sample)
Supplementary Instructions - Two-Year College [DOCX] 2013-JAN M140-00 22 00.2YR
Supplementary Conditions - Two-Year College [DOCX] 2013-JAN M140-00 73 00.2YR
Bowling Green State University
Supplementary Conditions - General Contracting [PDF] 2013-APR M160-00 73 00.13.BGU
Miami University
Supplementary Conditions - General Contracting [PDF] 2015-AUG M160-00 73 00.13.MUN
The Ohio State University
Supplementary Conditions - General Contracting [PDF] 2016-AUG M160-00 73 00.13.OSU
Sinclair Community College
Supplementary Instructions [PDF] 2015-NOV M140-00 22 00.SCC
Supplementary Conditions - General Contracting [PDF] 2015-NOV M160-00 73 00.13.SCC
University of Akron
Supplementary Conditions - General Contracting [PDF] 2015-MAY M160-00 73 00.13.UAK
Wright State University
Supplementary Conditions - General Contracting [PDF] 2016-MAR M160-00 73 00.13.WSU

 

Verison Control Documents - General Contracting Projects

The following documents are for reference only.

Title Date Number
Version Control Document - General Contracting
(July 2015 - Jan 2016) [PDF]
2016-JAN M160-01-VC

Version Control Document - General Contracting
(April 2014 - July 2015) [PDF]

2015-JUL M160-01-VC
Version Control Document - General Contracting
(Sept 2012 - April 2014) [PDF]
2014-APR M160-01-VC
Version Control Document - General Contracting
(June 2012 - Sept 2012) [PDF]
2012-SEP M160-01-VC
Version Control Document - General Contracting
(Dec 2011- June 2012) [PDF]
2012-JUN M160-01-VC

Standard Requirements for Public Facility Construction (Limited Scope Project)

Page last updated: November 30, 2017

Contract Documents - Limited Scope Projects
Title Date Number
Instructions to the Architect/Engineer [PDF] 2016-JAN M165-00 00 01
Table of Contents [DOCX] 2015-JUL M165-00 01 10
Paper Bidding Documents
Solicitation [DOCX] 2017-NOV M160-00 10 00
Invitation to Bid [DOCX] (Projects under $215,000)  2016-AUG M165-00 11 16 
Instructions to Bidders [PDF] 2016-JAN M165-00 21 13
Bid Form [DOCX] 2015-MAR M165-00 41 13
Electronic Bidding Documents
Solicitation (eBid) [DOCX] 2016-AUG M160-00 10 00.EB
Invitation to Bid [DOCX] (Projects under $215,000)  2016-AUG M160-00 11 16.EB 
Instructions to Bidders (eBid) [PDF] 2016-JAN M165-00 21 13.EB
Bid Form (eBid) [DOCX] 2017-OCT M165-00 41 13.EB
Supplementary Instructions (Sample) [DOCX] 2014-DEC M140-00 22 00
Bid Security Form [Fillable PDF] 2014-JUN M140-00 43 13
Bidder's Qualifications [PDF] 2014-JUN M140-00 45 13
EDGE Affidavit [PDF] 2016-MAR M140-00 45 39
Agreement Form
State Agency / Higher Education [DOCX] 2017-MAY M165-00 52 13
K-12 School Project [DOCX] 2017-MAY M165-00 52 13.K12
Local College Project [DOCX] 2017-MAY M165-00 52 13.2YR
Local University Project [DOCX] 2017-MAY M165-00 52 13.4YR
Subcontract Form (Must be used with Limited Scope Projects) [DOCX] 2015-JUL C190-00 52 14
Performance and Payment Bond Form [Fillable PDF] 2014-APR M140-00 61 13
General Conditions [PDF] 2017-JUN M165-00 72 13
Supplementary Conditions (Sample) [DOCX] 2014-DEC M140-00 73 00
Combined File of Limited Scope Contract Documents [PDF] 2016-JAN M165-01

Standard Requirements for Public Facility Construction (CM at Risk Project)


Page last updated: April 05, 2018

Contract Documents - CM at Risk Projects

Title Date Number
Table of Contents [DOCX] 2018-JAN M170-00 01 01
Request for Proposal
State Agency / Higher Education [DOCX] 2018-JAN M170-00 11 19
K-12 School Project [DOCX] 2018-JAN M170-00 11 19.K12
Local College Project [DOCX] 2018-JAN M170-00 11 19.2YR
Local University Project [DOCX] 2018-JAN M170-00 11 19.4YR
Instructions to Proposers [PDF] 2018-JAN M170-00 21 16
Proposal / Best Value Rating Form [XLSX] 2015-OCT F170-00 43 23
Proposal / Best Value Rating Form for Multiple Sites [XLSX] 2017-DEC F170-00 43 23.MS
Proposal / Best Value Rating Form with GMP [XLSX] 2015-OCT F170-00 43 23.GMP
EDGE Affidavit [PDF] 2016-MAR M140-00 45 30
Agreement Form
State Agency / Higher Education [DOCX] 2018-JAN M170-00 52 23
K-12 School Project [DOCX] 2018-JAN M170-00 52.23.K12
Local College Project [DOCX] 2018-JAN M170-00 52.23.2YR
Local University Project [DOCX] 2018-JAN M170-00 52 23.4YR
Exhibits to Agreement
Exhibit A - Personnel Rate Schedule [DOCX] 2014-OCT M170-00 52 23.XA
Exhibit B - Reimbursable Expenses Schedule [DOCX] 2014-OCT M170-00 52.23.XB
Exhibit C - General Conditions Costs Description [DOCX] 2014-OCT M170-00 52.23.XC
Exhibit D - GMP Amendment (listed below)
GMP Amendment - State Agency / Higher Education [DOCX] 2018-JAN M170-00 53 23
GMP Amendment - K-12 School Project [DOCX] 2018-JAN M170-00 53.23.K12
GMP Amendment - Local College Project [DOCX] 2018-JAN M170-00 53 23.2YR
GMP Amendment - Local University Project [DOCX] 2018-JAN M170-00 53 23.4YR
Subcontract Form (Must be used with CM at Risk Projects)[DOCX] 2016-OCT C190-00 52 34
Performance Bond Form [Fillable PDF] 2018-JAN M170-00 61 13.13
Payment Bond Form [Fillable PDF] 2018-JAN M170-00 61 13.16
Acknowledgement of Surety [PDF] 2018-JAN M170-00 61 13.19
Contracting Definitions [PDF] 2018-JAN M170-00 71 00
General Conditions [PDF] 2018-JAN M170-00 72 23
Supplementary Conditions (Sample) [DOCX] 2018-JAN M140-00 73 00
Wage Rate Requirements [PDF] 2018-JAN M170-00 73 43
Combined File of CM at Risk Contract Documents [PDF] 2018-JAN M170-01
 

 

Supplementary Documents - CM at Risk Projects

Owner / Title Date Number
K-12 or Career-Tech School Project (Sample)
Supplementary Conditions - CM at Risk [DOCX] (Use with Projects advertised AFTER Jan. 1, 2018) 2018-JAN M140-00 73 00.23.K12
Supplementary Conditions - CM at Risk [DOCX] (Use with Projects advertised BEFORE Jan. 1, 2018) 2017-AUG M140-00 73 00.23.K12
Two-Year Colleges (Sample)
Supplementary Conditions - CM at Risk [DOCX] 2013-JAN M140-00 73 00.2YR
Bowling Green State University
Supplementary Conditions - CM at Risk [PDF] 2013-APR M170-00 73 00.23.BGU
Ohio Department of Rehabilitation and Correction 
Supplementary Conditions - CM at Risk [PDF] 2016-JUN M170-00 73 00.23.DRC
Ohio Department of Transportation
Supplementary Conditions - CM at Risk [PDF] 2016-APR M170-00 73 00.23.DOT
Ohio Department of Youth Services
Supplementary Conditions - CM at Risk [PDF] 2016-APR M170-00 73 00.23.DYS
The Ohio State University
Supplementary Conditions - CM at Risk [PDF] 2016-AUG M170-00 73 00.23.OSU
Wright State University
Supplementary Conditions - CM at Risk [PDF] 2016-MAR M170-00 73 00.23.WSU

 

Version Control Documents - CM at Risk Projects

The following documents are for reference only.

Title Date Number
Version Control Document - CM at Risk
(Jan 2016 - Jan 2018) [PDF]
2018-JAN M170-01-VC
Version Control Document - CM at Risk
(July 2015 - Jan 2016) [PDF]
2016-JAN M170-01-VC
Version Control Document - CM at Risk
(April 2014 - July 2015) [PDF]
2015-JUL M170-01-VC
Version Control Document - CM at Risk
(Sept / Nov 2012 - April 2014) [PDF]
2014-APR M170-01-VC
Version Control Document - CM at Risk
(June 2012 - Sept 2012) [PDF]
2012-SEP M170-01-VC
Version Control Document - CM at Risk
(Feb 2012- June 2012) [PDF]
2012-JUN M170-01-VC

Standard Requirements for Public Facility Construction (Design-Build Project)

Page last updated: January 31, 2018

Contract Documents - Design Build Projects
Title Date Number
Table of Contents [DOCX] 2015-JUL M180-00 01 10
Request for Proposal
State Agency / Higher Education [DOCX] 2017-SEP M180-00 11 19
K-12 School Project [DOCX] 2017-SEP M180-00 11 19.K12
Local College Project [DOCX] 2017-SEP M180-00 11 19.2YR
Local University Project [DOCX] 2017-SEP M180-00 11 19.4YR
Instructions to Proposers [PDF] 2017-SEP M180-00 21 16
Proposal / Best Value Rating Form [XLSX] 2015-OCT F180-00 43 53
Proposal / Best Value Rating Form with GMP [XLSX] 2015-OCT F180-00 43 53.GMP
EDGE Affidavit [PDF] 2016-MAR M140-00 45 39
Agreement Form
State Agency / Higher Education [DOCX] 2017-MAY M180-00 52 53
K-12 School Project [DOCX] 2017-MAY M180-00 52 53.K12
Local College Project [DOCX] 2017-MAY M180-00 52 53.2YR
Local University Project [DOCX] 2017-MAY M180-00 52 53.4YR
Exhibits to Agreement
Exhibit A - Supplementary Scope Statement (AOR) [PDF] 2016-JAN M180-00 54 13
Exhibit C - AOR's Fee Schedule for Personnel [DOCX] 2015-FEB M180-00 52 53.XC
Exhibit D - Personnel Rate Schedule [DOCX] 2015-FEB M180-00 52 53.XD
Exhibit E - Reimbursable Expenses Schedule [DOCX] 2015-FEB M180-00 52 53.XE
Exhibit F - General Conditions Costs Description [DOCX] 2015-FEB M180-00 52 53.XF
Exhibit G - GMP Amendment

GMP Amendment - State Agency / Higher Education [DOCX]

2016-JAN M180-00 53 53

GMP Amendment - K-12 School Project [DOCX]

2016-JAN M180-00 53.53.K12

GMP Amendment - Local College Project [DOCX]

2016-JAN M180-00 53 53.2YR

GMP Amendment - Local University Project [DOCX]

2016-JAN M180-00 53 53.4YR
Exhibit H -Minimum Stage Submission requirements (DB) [DOCX] 2018-JAN M180-00 52 53.XH
Subcontract Form (Must be used with Design-Build Projects) [DOCX] 2016-OCT C190-00 52 54
Performance Bond Form [PDF] 2014-APR M170-00 61 13.13
Payment Bond Form [PDF] 2014-APR M170-00 61 13.16
Contracting Definitions [PDF] 2016-MAR M180-00 71 00
General Conditions [PDF] 2016-JAN M180-00 72 53
Supplementary Conditions (Sample) [DOCX] 2014-DEC M140-00 73 00
Wage Rate Requirements [PDF] 2014-APR M180-00 73 43
Combined File of Design-Build Contract Documents [PDF] 2016-JAN M180-01

 

Supplementary Documents - Design Build Projects
Owner / Title Date Number
K-12 or Career-Tech School Project (Sample)
Supplementary Conditions - Design-Build [DOCX] 2017-SEP M140-00 73 00.53.K12
Two-Year Colleges (Sample)
Supplementary Conditions - Design-Build [DOCX] v0113 M140-00 73 00.2YR
Bowling Green State University
Supplementary Conditions - Design-Build [PDF] v0413 M180-00 73 00.53.BGU
The Ohio State University
Supplementary Conditions - Design-Build [PDF] 2016-AUG M180-00 73 00.53.OSU
University of Akron
Supplementary Conditions - Design-Build [PDF] 2015-AUG M180-00 73 00.53.UAK
Wright State University
Supplementary Conditions - Design-Build [PDF] 2016-MAR M180-00 73 00.53.WSU

 

Version Control Documents - Design Build Projects

The following documents are for reference only.

Version Control Documents Date Number
Version Control Document - Design Build
(April 2014 - Jan 2016) [PDF]
2016-JAN M180-01-VC
Version Control Document - Design Build
(Sept / Nov 2012 - April 2014) [PDF]
2015-JUL M180-01-VC
Version Control Document - Design Build
(Sept / Nov 2012 - April 2014) [PDF]
2014-APR M180-01-VC
Version Control Document - Design Build
(June 2012 - Sept 2012) [PDF]
v0912 M180-01-VC
Version Control Document - Design Build
(April 2012- June 2012) [PDF]
v0612 M180-01-VC

Standard Requirements for Public Facility Construction (Miscellaneous Documents)

Title Date Number
State of Ohio Subcontract Form (Must be used with General Contracting, CM at Risk and Design-Build Projects)
Subcontract Form (General Contracting Project) [DOCX] 2016-OCT C190-00 52 14
Subcontract Form (CM at Risk Project) [DOCX] 2016-OCT C190-00 52 34
Subcontract Form (Design-Build Project) [DOCX] 2016-OCT C190-00 52 54
Construction CPM Schedule Specification [PDF] 2012-DEC M310-11
Allowance Procedure for CPM Schedule Specification [PDF] 2012-DEC M310-12

Document Search

Notice

 

Search for a document above or browse standard forms or agreements and standard requirements.

The State of Ohio Standard Requirements for Public Facility Construction ("Standard Requirements") and the State of Ohio Standard Forms and Documents are the property of the State of Ohio Ohio Facilities Construction Commission (OFCC) and are for public use only.

 

These files are not to be altered in any way, except where recognized blanks are filled-in with specific names, amounts, and other data for the purpose of personalizing the file for a specific agency, company and/or person. Any other changes made to these files must be approved, in writing, by the OFCC. The OFCC and the State of Ohio will not be held liable for changes made without our written approval.